Accomplished:
-researched TSA chapters in Arizona/New Mexico Area
-brainstormed project continuations for next year
Goals:
-refine Plan of Procedures for replication elsewhere
-more research on WHO would want to build this
Showing posts with label MP2. Show all posts
Showing posts with label MP2. Show all posts
Monday, January 23, 2012
Thursday, January 19, 2012
Log Thurs 19 December 2012
Accomplished:
-presented FPU for 2nd marking period
Goals:
-begin 3rd marking period work re: testing, revising.
-presented FPU for 2nd marking period
Goals:
-begin 3rd marking period work re: testing, revising.
Tuesday, January 17, 2012
Log Tues 17 January 2012
Accomplished:
-completed STEMM report and sent to mentor for review
Goals:
-present FPU for 2nd marking period
-completed STEMM report and sent to mentor for review
Goals:
-present FPU for 2nd marking period
Thursday, January 12, 2012
Log Thurs 12 January 2012
Accomplished:
-completed FPU outline and practiced presentation
-added some illustrations to STEMM report (Science and Technology Sections)
-completed Mathematics section and part of Technology section of STEMM report
Goals:
-finish Technology section of STEMM report
-finish conclusion
-add more illustrations (esp. to Mathematics Section)
-send STEMM to Rob! v. Important before COB Friday!
-completed FPU outline and practiced presentation
-added some illustrations to STEMM report (Science and Technology Sections)
-completed Mathematics section and part of Technology section of STEMM report
Goals:
-finish Technology section of STEMM report
-finish conclusion
-add more illustrations (esp. to Mathematics Section)
-send STEMM to Rob! v. Important before COB Friday!
Tuesday, January 10, 2012
Log Tues 10 January 2012
Accomplished:
-finished "Science" section for STEMM report
-wrote "Volumetrics" and "Evaporation Rate" subheadings for Mathematics section
-wrote majority of Conclusion for STEMM report (could not summarize unwritten sections, will add as they are completed)
Goals:
-complete"Technology" and "Mathematics" sections for STEMM report
-add illustrations where appropriate
-prepare for FPU
-finished "Science" section for STEMM report
-wrote "Volumetrics" and "Evaporation Rate" subheadings for Mathematics section
-wrote majority of Conclusion for STEMM report (could not summarize unwritten sections, will add as they are completed)
Goals:
-complete"Technology" and "Mathematics" sections for STEMM report
-add illustrations where appropriate
-prepare for FPU
Thursday, January 5, 2012
Log Thurs 5 January 2012
Accomplished:
-consolidated more mentor contacts
-compiled works cited page (so far)
-finished "Engineering" heading for STEMM report
Goals:
-complete Science, Math and Technology headings for STEMM report
-prepare for FPU
-consolidated more mentor contacts
-compiled works cited page (so far)
-finished "Engineering" heading for STEMM report
Goals:
-complete Science, Math and Technology headings for STEMM report
-prepare for FPU
Tuesday, January 3, 2012
Log Tues 3 January 2012
Accomplished:
-consolidated mentor contacts
-posted pictures of final construction
-added some images to STEMM report
-organized headings/subheadings in STEMM report
-completed most of "Engineering" heading for STEMM report.
Goals:
-finish "System Type" and "Engineering Type" subheadings for STEMM report
-start writing up mathematics and science concepts for STEMM report
-contact TSA chapters in Arizona/New Mexico for possible testing??
-consolidated mentor contacts
-posted pictures of final construction
-added some images to STEMM report
-organized headings/subheadings in STEMM report
-completed most of "Engineering" heading for STEMM report.
Goals:
-finish "System Type" and "Engineering Type" subheadings for STEMM report
-start writing up mathematics and science concepts for STEMM report
-contact TSA chapters in Arizona/New Mexico for possible testing??
Thursday, December 22, 2011
Log Thurs 22 Dec 2011
Accomplished:
-FINISHED CONSTRUCTION
-resarched leagile manufacturing
Goals
-send images to mentor
-add images to STEMM report
-write about innovation/open system for STEMM report
-FINISHED CONSTRUCTION
-resarched leagile manufacturing
Goals
-send images to mentor
-add images to STEMM report
-write about innovation/open system for STEMM report
Tuesday, December 20, 2011
Log Tues 20 December 2011
Accomplished
-attatched outtake and intake pipes to barrel
-attatched funnel to intake pipe
-caulked edges of pipes
Goals
-paint outside of barrel
-attatched outtake and intake pipes to barrel
-attatched funnel to intake pipe
-caulked edges of pipes
Goals
-paint outside of barrel
Friday, December 16, 2011
Log Fri 16 December 2011
Accomplished:
-affixed cone to plexi
-washed out barrel
Goals:
-adhere funnel to intake pipe
-attach intake/outtake pipes to barrel and seal edge
-procure last elbow joint
-affixed cone to plexi
-washed out barrel
Goals:
-adhere funnel to intake pipe
-attach intake/outtake pipes to barrel and seal edge
-procure last elbow joint
Wednesday, December 14, 2011
Log Wed 14 December 2011
Accomplished:
-cone did not properly adhere overnight
-fixed cone (melting rather than epoxy)
-smoothed plexi circle edges
-wrote intro for STEMM report
-researched manufacturing methods for STEMM report and chose a combination of prefabrication, American system, lean, and agile manufacturing.
Goals:
-adhere cone to plexi
-add pipes to barrel
-wash out barrel.
-cone did not properly adhere overnight
-fixed cone (melting rather than epoxy)
-smoothed plexi circle edges
-wrote intro for STEMM report
-researched manufacturing methods for STEMM report and chose a combination of prefabrication, American system, lean, and agile manufacturing.
Goals:
-adhere cone to plexi
-add pipes to barrel
-wash out barrel.
Monday, December 12, 2011
Log Mon 12 December 2011
Accomplished:
-constructed cone
Goals:
-procure final elbow joint
-wash out barrel
-attach cone to plexi
-constructed cone
Goals:
-procure final elbow joint
-wash out barrel
-attach cone to plexi
Thursday, December 8, 2011
Log Thurs 8 Dec 2011
Accomplished:
-cut out plexiglass circle for desal cone
-cut out cavity in barrel top for cone
-prepared funnels for intake/outtake
-drilled holes for intake/outtake
Goals:
-construct desal cone
-procure extra elbow for added pipe length
-cut out plexiglass circle for desal cone
-cut out cavity in barrel top for cone
-prepared funnels for intake/outtake
-drilled holes for intake/outtake
Goals:
-construct desal cone
-procure extra elbow for added pipe length
Tuesday, December 6, 2011
Log Tues 5 December
Accomplished:
-added anti-splash insurance and stabilization structures to CAD drawings
-constructed intake and outflow pipes
-marked locations for intake and outflow holes
-marked up plexiglass circle, could not cut out due to equipment unavailability
Goals:
-cut out plexiglass circle and begin cone construction
-cut out intake and outflow holes
-added anti-splash insurance and stabilization structures to CAD drawings
-constructed intake and outflow pipes
-marked locations for intake and outflow holes
-marked up plexiglass circle, could not cut out due to equipment unavailability
Goals:
-cut out plexiglass circle and begin cone construction
-cut out intake and outflow holes
Friday, December 2, 2011
Log Fri 2 December 2011
Accomplished:
- finalized press release, added images, turned in
-contacted mentor
-waiting for Plan of Procedures authorization, construction phase delayed slightly
Goals:
-construct intake and outtake pipe
- finalized press release, added images, turned in
-contacted mentor
-waiting for Plan of Procedures authorization, construction phase delayed slightly
Goals:
-construct intake and outtake pipe
Wednesday, November 30, 2011
Log Wed 30 Nov 2011
Accomplished:
-edited press release
-turned in final plan of procedures for construction approval
Goals:
-construct intake pipe
-construct outflow pipe
-edited press release
-turned in final plan of procedures for construction approval
Goals:
-construct intake pipe
-construct outflow pipe
Monday, November 28, 2011
Log Mon 28 Nov 2011
Accomplished:
-procured PVC, funnels, barrel, clear plastic for lid and cone, and adhesives for final product
-revamped cone design
-updated PoP re: cone design
Goals:
-procure bulkhead fittings for final product
-begin construction of intake/outtake pipes
-procured PVC, funnels, barrel, clear plastic for lid and cone, and adhesives for final product
-revamped cone design
-updated PoP re: cone design
Goals:
-procure bulkhead fittings for final product
-begin construction of intake/outtake pipes
Wednesday, November 23, 2011
Log Wed 23 Nov 2011
Accomplished:
-researched prices of all materials
-made cohesive shopping list so as not to waste Guiseppe's time
-collected some materials from lab
Goals:
-buy all materials
-begin construction
-researched prices of all materials
-made cohesive shopping list so as not to waste Guiseppe's time
-collected some materials from lab
Goals:
-buy all materials
-begin construction
Monday, November 21, 2011
Log Mon 21 Nov 2011
Accomplished:
-contacted mentor
-finish press release
-finish calendar dates
Goals:
-assemble materials for final product
-begin construction
-contacted mentor
-finish press release
-finish calendar dates
Goals:
-assemble materials for final product
-begin construction
Friday, November 18, 2011
Log Fri 18 November 2011
Accomplished:
-short paragraph on assembly
-finished screenshots for step-by-step assembly and final product re: PoP
-added hinge to lid on CAD
-80% done with Press Release
-contacted mentor
-updated calendar schedules
Goals:
-Press Release
-obtain materials for final product!
-short paragraph on assembly
-finished screenshots for step-by-step assembly and final product re: PoP
-added hinge to lid on CAD
-80% done with Press Release
-contacted mentor
-updated calendar schedules
Goals:
-Press Release
-obtain materials for final product!