GMG: Capstone Design Project: Desalination Unit

Monday, December 12, 2011

Log Mon 12 December 2011

Accomplished:
-constructed cone


Goals:
-procure final elbow joint
-wash out barrel
-attach cone to plexi
Posted by GMG at 2:22 PM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Labels: log, MP2, schedule

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Search This Blog

Blog Archive

  • ►  2012 (25)
    • ►  March (3)
    • ►  February (9)
    • ►  January (13)
  • ▼  2011 (61)
    • ▼  December (9)
      • Log Thurs 22 Dec 2011
      • Log Tues 20 December 2011
      • Post re: Adhesive Method Used on Desal Cone
      • Log Fri 16 December 2011
      • Log Wed 14 December 2011
      • Log Mon 12 December 2011
      • Log Thurs 8 Dec 2011
      • Log Tues 5 December
      • Log Fri 2 December 2011
    • ►  November (11)
    • ►  October (15)
    • ►  September (14)
    • ►  August (12)

Total Pageviews

Contributors

  • GMG
  • MAST Technology: Design & Problem Solving
  • jcuttrell

Labels

schedule log MP2 MP1 MP3 final images solutions materials model scale team testing CAD brainstorming construction individual research salinity background bacteria calendar chile culture design brief drawings edit isometric maintenence procedure rationale specifications supplies volume STEMM atacama climate cone cost engineering exploded limitations manufacturing math matrix midterm mining orthographic plan power presentation press release respources science size survey technology tools user
GMG. Awesome Inc. theme. Powered by Blogger.