Accomplished:
-finished 96-hour testing period, collected device from testing site
-collected several water samples
Goals:
-run chemical analyses on water samples
-add results to testing report and finish conclusion
Tuesday, February 28, 2012
Friday, February 24, 2012
Log Fri 24 February 2012
Accomplished:
-completed 24-hour testing period
-recorded results
Goals:
-complete 96-hour testing period
-record results
-completed 24-hour testing period
-recorded results
Goals:
-complete 96-hour testing period
-record results
Wednesday, February 22, 2012
Log Wed 22 February 2012
Accomplished:
-finalized permissions to test at MCVSD Career Center Greenhouses
-began assembling testing materials (pH strips, refractometer, coliform indicator etc)
-measured transport vehicle area to optimize positioning of device
Goals:
-complete testing 23-24 February
-complete Testing Report
-finalized permissions to test at MCVSD Career Center Greenhouses
-began assembling testing materials (pH strips, refractometer, coliform indicator etc)
-measured transport vehicle area to optimize positioning of device
Goals:
-complete testing 23-24 February
-complete Testing Report
Saturday, February 18, 2012
Log Fri 17 February 2012
Accomplished:
-added more pictures for testing report
-formulated agenda for testing days 23-24 February
Goals:
-find directions to testing site
-gain formal permissions to test
-begin gathering testing materials
-added more pictures for testing report
-formulated agenda for testing days 23-24 February
Goals:
-find directions to testing site
-gain formal permissions to test
-begin gathering testing materials
Wednesday, February 15, 2012
Log Wed 15 February 2012
Accomplished:
-Final Product awaiting grading
-Testing Stages Explanation Complete
-added some pictures to Testing Report
Goals:
-add more pictures to Testing Report
-Start Self Assessment Report
-Final Product awaiting grading
-Testing Stages Explanation Complete
-added some pictures to Testing Report
Goals:
-add more pictures to Testing Report
-Start Self Assessment Report
Monday, February 13, 2012
Log Mon 13 Febuary 2012
Accomplished:
-contacted MCVSD Career Center re: scheduling of testing
-Finished Testing Report Intro and Procedure List
-started Testing Report Stages Explanation
Goals:
-Testing Report Stages Explanation
-Final edits on final product
-contacted MCVSD Career Center re: scheduling of testing
-Finished Testing Report Intro and Procedure List
-started Testing Report Stages Explanation
Goals:
-Testing Report Stages Explanation
-Final edits on final product
Wednesday, February 8, 2012
Log Thursday 9 February 2012
Accomplished:
-contacted mentor
-set date for MCVSD Testing on 22 February 2012
Goals:
-contact MCVSD Career Center to finalize testing time/schedule/etc
-make final edits to final product in preparation for assessment
-continue writeup of Testing Report
-contacted mentor
-set date for MCVSD Testing on 22 February 2012
Goals:
-contact MCVSD Career Center to finalize testing time/schedule/etc
-make final edits to final product in preparation for assessment
-continue writeup of Testing Report
Monday, February 6, 2012
Log Mon 6 February 2012
Accomplished
-contacted mentor re: EcoComplex testing site
-recieved rubric and due dates and filled calendar schedule
-gained testing site permission from MCVSD Career Center Greenhouses
-began setting up structure of testing report
Goals:
-set up testing site at MAST
-attach desal cone to plexi in a non-temperature-dependent way
-contacted mentor re: EcoComplex testing site
-recieved rubric and due dates and filled calendar schedule
-gained testing site permission from MCVSD Career Center Greenhouses
-began setting up structure of testing report
Goals:
-set up testing site at MAST
-attach desal cone to plexi in a non-temperature-dependent way
Thursday, February 2, 2012
Log Thursday 2 February 2012
Accomplished:
-contacted Stevens and TCNJ re: testing environment
-wrote up mentor contact
Goals:
-set up MAST testing procedure
-continue looking for controlled testing environment
-contacted Stevens and TCNJ re: testing environment
-wrote up mentor contact
Goals:
-set up MAST testing procedure
-continue looking for controlled testing environment