GMG: Capstone Design Project: Desalination Unit

Friday, February 24, 2012

Log Fri 24 February 2012

Accomplished:
-completed 24-hour testing period
-recorded results

Goals:
-complete 96-hour testing period
-record results
Posted by GMG at 1:26 PM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Labels: log, MP3, schedule

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Search This Blog

Blog Archive

  • ▼  2012 (25)
    • ►  March (3)
    • ▼  February (9)
      • Log Tue 28 February 2012
      • Log Fri 24 February 2012
      • Log Wed 22 February 2012
      • Log Fri 17 February 2012
      • Log Wed 15 February 2012
      • Log Mon 13 Febuary 2012
      • Log Thursday 9 February 2012
      • Log Mon 6 February 2012
      • Log Thursday 2 February 2012
    • ►  January (13)
  • ►  2011 (61)
    • ►  December (9)
    • ►  November (11)
    • ►  October (15)
    • ►  September (14)
    • ►  August (12)

Total Pageviews

Contributors

  • GMG
  • MAST Technology: Design & Problem Solving
  • jcuttrell

Labels

schedule log MP2 MP1 MP3 final images solutions materials model scale team testing CAD brainstorming construction individual research salinity background bacteria calendar chile culture design brief drawings edit isometric maintenence procedure rationale specifications supplies volume STEMM atacama climate cone cost engineering exploded limitations manufacturing math matrix midterm mining orthographic plan power presentation press release respources science size survey technology tools user
GMG. Awesome Inc. theme. Powered by Blogger.