GMG: Capstone Design Project: Desalination Unit

Monday, March 5, 2012

Log Mon 5 March 2012

Accomplished:
-wrote most of SE report

Goals:
-finishe SE report
-add pictures to self evaluation report
Posted by GMG at 2:39 PM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Labels: log, MP3, schedule

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Search This Blog

Blog Archive

  • ▼  2012 (25)
    • ▼  March (3)
      • Log Wed 7 March 2012
      • Log Mon 5 March 2012
      • Log Fri 2 March 2012
    • ►  February (9)
    • ►  January (13)
  • ►  2011 (61)
    • ►  December (9)
    • ►  November (11)
    • ►  October (15)
    • ►  September (14)
    • ►  August (12)

Total Pageviews

Contributors

  • GMG
  • MAST Technology: Design & Problem Solving
  • jcuttrell

Labels

schedule log MP2 MP1 MP3 final images solutions materials model scale team testing CAD brainstorming construction individual research salinity background bacteria calendar chile culture design brief drawings edit isometric maintenence procedure rationale specifications supplies volume STEMM atacama climate cone cost engineering exploded limitations manufacturing math matrix midterm mining orthographic plan power presentation press release respources science size survey technology tools user
GMG. Awesome Inc. theme. Powered by Blogger.